Road projects
Define the road layout, lighting requirements and installation positions.
Solar Street Light / Project Configuration
Start with the site solar resource, operating schedule and required lighting performance. Battery, panel and luminaire specifications need product-specific confirmation.
Solar road lighting · Energy and operating schedule to confirm
Define the road layout, lighting requirements and installation positions.
Review shading, local solar data and environmental conditions.
Agree the lighting hours and dimming profile before sizing storage.
Size the system against local solar data and the agreed lighting load.
Confirm autonomy, battery limits and maintenance requirements.
Review the panel, storage, controller and pole interfaces together.
| Item | Specification | Unit | Status |
|---|---|---|---|
| Luminaire rated power | To confirm | — | To confirm · 待确认 |
| PV module rated power | To confirm | — | To confirm · 待确认 |
| PV module configuration | To confirm | — | To confirm · 待确认 |
| Lighting schedule / dimming | To confirm | — | To confirm · 待确认 |
| Photometric file / distribution | To confirm | — | To confirm · 待确认 |
| Mounting arrangement / height | To confirm | — | To confirm · 待确认 |
| Item | Specification | Unit | Status |
|---|---|---|---|
| Battery chemistry / capacity | To confirm | — | To confirm · 待确认 |
| Battery nominal voltage | To confirm | — | To confirm · 待确认 |
| Autonomy design target | To confirm | — | To confirm · 待确认 |
| Permitted depth of discharge | To confirm | — | To confirm · 待确认 |
| Charge controller / protections | To confirm | — | To confirm · 待确认 |
| Enclosure / installation interface | To confirm | — | To confirm · 待确认 |
Confirmed = user-approved information. On drawing = retained drawing note. To confirm / 待确认 = product-specific review required. No missing value is inferred from another product.
Panel rating, luminaire load and optical requirements to confirm.
Battery type, capacity, DoD limits and controller settings to confirm.
Mounting layout, wiring routes and site interfaces to confirm.
Review local weather data, shading and panel orientation.
Confirm the operating schedule, energy balance, autonomy and permitted battery DoD.
Review pole and foundation inputs, access, environmental conditions and maintenance needs.
Share the application, location, required quantity and supply scope. Include available drawings, site conditions and performance targets.
Use the status beside each specification. Pending values require confirmation before procurement or design approval.
Downloads are available only when a product-specific document and its public-use permission have been approved.
Start with your project
Share the location, quantity, application and required configuration.
Technical values and supply scope are reviewed against your project inputs.