Choose a High Mast Configuration for Your Project
Use the product records to identify a starting point, then compare the lighting, maintenance and installation requirements for your site. A record title does not establish the final design or included equipment.
20m Motorized Configuration
Confirmed 20m height and motorized raising/lowering. Its product page distinguishes confirmed identity, drawing notes and outstanding engineering inputs.
Review 20m detailsAirport & Stadium Inquiry
Prepare the lighting criteria, operating constraints, mounting positions and required maintenance arrangement. Product-specific dimensions and equipment remain to be agreed.
Review the application recordIndependent 30m Product
A separate 30m inquiry path. Confirm its mast geometry, maintenance arrangement and supply package; do not reuse the 20m drawing for a 30m order.
Prepare a 30m inquiryWhat Changes the Required Supply Package?
Identify whether the inquiry includes the mast only, or also luminaires, brackets, maintenance equipment, anchors, power distribution and cables. State the required drawings, inspection documents and installation responsibilities. Foundation and site work are not automatically included.
For airport, stadium, port or other large-area applications, provide the exact site and project criteria rather than selecting by height or wattage alone. Use the high mast project-input checklist to prepare a complete inquiry.
High Mast Buying Questions
What information is needed for a quotation?
Send the country and exact site, quantity, layout, proposed height, lighting objectives, maintenance method, wind-design inputs and supply scope. Include the delivery destination and available project drawings.
Are the listed products the same configuration?
No. Only the dedicated 20m record has its stated drawing-specific configuration. Other product records require their own agreed dimensions, equipment and technical documents.
Is there a public price list or fixed lead time?
No fixed public prices are published. Configuration, quantity, equipment, packing and delivery basis affect the offer. Confirm lead time, commercial terms and warranty for the selected project package.
Can I use the website notes for construction?
Use the website to prepare the procurement discussion. Product-specific drawings, structural and foundation interfaces, and required inspection documents must be reviewed and agreed before construction.
Read the high mast cost factors · Request a high mast project quote